Program: HTP North CorridorPackage: All (5)Scenario: BaselineBoundary: A1-A5, B, C, D reported separatelyDataset: EC3 snapshot 2026-07-14Method: EN 17472 / TRACI 2.1
Calculation trace
Every quantity line, conversion and factor behind the program total, in audit order · Baseline
Reconciliation
Every line reconciles to quantity × factor
Lines in trace
3,412
all quantity records
Top 10 shown
130,434
tCO2e, 10 largest lines
Remaining lines
54,186
tCO2e, 3,402 lines
Program total
184,620
tCO2e, A1-C4
Line calculations
Quantity × factor, with conversion, recomputed check and stage split
Line by line calculation showing quantity, conversion, factor and stage results
Item IDDescriptionQuantityConversion appliedFactorRecomputedA1-A3A4-A5BCTotalEPD reference
TU-C-0114
Precast segmental lining, C50/60
Manufacturer EPD
42,180 m3m3 to declared unit 1 m3, factor 1.01.488tCO2e/m362,764reconciles46,8405,1208,2102,61062,780EPD-CBE-8841-2
PR-S-0088
Reinforcement bar, grade 500, all packages
Manufacturer EPD
39,400,000 kgkg to declared unit 1,000 kg, factor 0.0010.762kgCO2e/kg30,023reconciles22,4102,4803,9401,19030,020EPD-NUCOR-3312-1
ST-S-0119
Structural steel sections, S355
Industry average
4,120,000 kgkg to declared unit 1,000 kg, factor 0.0012.31kgCO2e/kg9,517reconciles7,1807601,1804009,520EPD-AISC-0094-6
ST-C-0031
In-situ concrete, C40/50, base slab
Manufacturer EPD
18,470 m3m3 to declared unit 1 m3, factor 1.00.394tCO2e/m37,277reconciles5,4106209403107,280EPD-NRMCA-1109-2
EW-E-0007
Bulk excavation, spoil to licensed fill
Generic
486,000 m3Diesel plant model, 2.14 L per m30.0134tCO2e/m36,512reconciles06,12003906,510ECOINVENT-3.9-1120
TU-C-0210
Shotcrete primary lining
Industry average
11,620 m3m3 to kg at 2,350 kg/m30.446tCO2e/m35,183reconciles4,680500005,180EPD-ASTM-4471-1
TU-E-0500
Grid electricity, tunnel ventilation
Manufacturer EPD
14,900,000 kWhGrid factor declining 0.312 to 0.088 by 20750.312kgCO2e/kWh4,649reconciles004,65004,650EGRID-2026-NYUP
UT-P-0402
Ductile iron pipe, DN600
Generic
4,210 mm to declared unit 1 m, factor 1.00.61tCO2e/m2,568reconciles1,980210310702,570EPD-USPIPE-7741-3
TR-S-0155
Rail, 60E1 profile
Manufacturer EPD
1,240,000 kgkg to declared unit 1,000 kg, factor 0.0010.85kgCO2e/kg1,054reconciles79084140401,054EPD-SDI-5520-1
ST-A-0210
Bituminous surfacing, station approach
Industry average
8,940 tt to declared unit 1,000 kg, factor 1.00.097tCO2e/t867reconciles6407812230870EPD-COLAS-2214-2
Subtotal, 10 largest lines89,93015,97219,4925,040130,434
Showing the 10 largest contributing lines. The full export contains all 3,412 lines with the same columns. Recomputed values apply the declared unit conversion, so a line that drifts from its stated total is visible here rather than only in the export.
Conversion and adjustment rules
Conversion and adjustment rules applied program-wide
RuleDetailLines affected
Density conversionm3 to kg at declared density where the EPD unit differs412 lines
Construction wastage4.5% uplift applied to concrete and steel quantities at A51,884 lines
Regional adjustment1.06 factor where EPD geography is CA-ON and site is US-NY37 lines
Transport default82 km road, 32 t articulated, 62% load factor where no route given2,940 lines
Grid decarbonisationB6 electricity factor declines 0.312 to 0.088 kgCO2e/kWh by 207518 lines
Biogenic splitBiogenic flows reported separately, not netted against fossil GWP126 lines
Module D exclusionBenefits beyond boundary reported separately, excluded from total204 lines
Audit note. Every figure on the LCA, LCIA and report pages derives from these lines and rules. Changing a mapping or a methodology setting regenerates the trace and stamps a new version.
NEXT STEP
Generate a report
Export the trace with the assessment