Program: HTP North CorridorPackage: All (5)Scenario: BaselineBoundary: A1-A5, B, C, D reported separatelyDataset: EC3 snapshot 2026-07-14Method: EN 17472 / TRACI 2.1
Material mapping
Match quantity lines to environmental product declarations
94 items pending review
REVIEW QUEUE
TU-C-0210  Shotcrete primary lining
TU-03 Tunnel Lining | Geotechnical | 11,620 m3 | BOQ Rev14 line 1,884
Needs review
4 candidates by confidence
Sprayed concrete, 40 MPa, low carbon mix
Holcim US, Rochester NY plant  |  ASTM International  |  Valid to 12 Mar 2029
446.2 kgCO2e
per 1 m3  |  US-NY
94%
Shotcrete, wet mix, structural grade
Lafarge Canada  |  CSA Group  |  Valid to 08 Sep 2027
471.8 kgCO2e
per 1 m3  |  CA-ON
81%
Geography mismatch: EPD declared for CA-ON, project located in US-NY. Regional adjustment factor 1.06 applied.
Ready mix concrete, 35 MPa, industry average
NRMCA industry average  |  ASTM International  |  Valid to 30 Jun 2027
412.0 kgCO2e
per 1 m3  |  US average
67%
Concrete, generic structural, CML background
Ecoinvent 3.9 dataset  |  Not applicable  |  Dataset vintage 2024
389.4 kgCO2e
per 1 m3  |  RoW
44%
Candidate detail
Sprayed concrete, 40 MPa, low carbon mix
STAGE GWP FACTORS
A1 Raw material supply311.4
A2 Transport to works28.7
A3 Manufacturing62.9
A4 Transport to site24.1
A5 Installation19.1
Total446.20
kgCO2e per declared unit (1 m3)
Unit conversion applied
m3 to kg at 2,350 kg/m3, declared unit reconciled to project quantity of 11,620 m3.
PROVENANCE
EPD numberEPD-ASTM-4471-1
PublisherASTM International
Verification bodySCS Global Services
PCRUN CPC 375, v2.1
Expiry date12 Mar 2029
Retrieved14 Jul 2026 from EC3
NEXT STEP
View LCA results
96% mapped, enough to run the assessment
View LCA results