Program: HTP North CorridorPackage: All (5)Scenario: BaselineBoundary: A1-A5, B, C, D reported separatelyDataset: EC3 snapshot 2026-07-14Method: EN 17472 / TRACI 2.1
Reports
Templates bound to Baseline. Totals reconcile to 184,620 tCO2e and $412.8M NPV.
SCENARIO
Executive Summary
Program level carbon and cost narrative for the client board pack.
Last generated 12 Jul 2026
SCENARIO
Package Carbon Report
Stage by stage GWP for each of the five delivery packages.
Last generated 14 Jul 2026
Material Hotspot Analysis
Ranked material contributions with quantities and EPD references.
Last generated 14 Jul 2026
SCENARIO
LCIA Indicator Report
Six TRACI 2.1 categories with data quality and uncertainty.
Last generated 14 Jul 2026
Alternatives Comparison
Baseline against Alt 1 and Alt 2 with the recommendation basis.
Last generated 11 Jul 2026
$
LCCA Detail
60 year cash flow, discounting workings and sensitivity runs.
Last generated 09 Jul 2026
Carbon vs Cost Optimisation
Pareto analysis and marginal abatement cost curve.
Last generated 13 Jul 2026
Full Calculation Trace
Every quantity line, factor, conversion and adjustment applied.
Last generated 14 Jul 2026
Procurement Specification Extract
Carbon limits and EPD requirements written to tender clauses.
Last generated 27 Jun 2026
Generated reports
Files are assembled in the browser from the current scenario and boundary
Reports generated from this program
NameGenerated byDateFormatSize
HTP_NC_Package_Carbon_Report_Rev6.pdfPriya Nair14 Jul 2026, 11:52PDF8.4 MB
HTP_NC_Calculation_Trace_2026-07-14.xlsxMarcus Adeyemi14 Jul 2026, 10:16EXCEL24.7 MB
HTP_NC_Hotspots_TU03.xlsxDana Whitfield13 Jul 2026, 16:04EXCEL3.1 MB
HTP_NC_Alternatives_Board_Pack.pptxPriya Nair11 Jul 2026, 09:38PPTX18.2 MB
HTP_NC_LCCA_Detail_v4.xlsxRavi Krishnan09 Jul 2026, 14:27EXCEL11.6 MB
HTP_NC_Executive_Summary_Jul26.pdfMarcus Adeyemi12 Jul 2026, 08:11PDF2.9 MB
Rows above the highlighted entries are seeded history. Anything you generate now is a real file, built from the same arrays the pages render, and stamped with the program, scenario, boundary and generation time.