Program: HTP North CorridorPackage: All (5)Scenario: BaselineBoundary: A1-A5, B, C, D reported separatelyDataset: EC3 snapshot 2026-07-14Method: EN 17472 / TRACI 2.1
Total embodied carbon, A1-A5, B, C
184,620 tCO2e
At baseline± 15,167 tCO2e (8.2%) at one standard deviation
Product stage, A1-A3
128,340 tCO2e
69.5% of total
Construction stage, A4-A5
14,540 tCO2e
7.9% of total
Use stage, B
28,410 tCO2e
15.4% of total
End of life, C
13,330 tCO2e
7.2% of total
Module D, benefits beyond the boundary
-9,240 tCO2e
Reported separately, never netted against the total
Biogenic carbon: 1,840 tCO2e reported separately, not netted against fossil GWPScenario: Baseline
Life cycle stage waterfall
050k100k150k200k+128,340A1-A3+8,410A4+6,130A5+9,870B1-B5+18,540B6+13,330C1-C4184,620Total
Carbon by package
A1-A3A4-A5BC
TU-03 Tunnel Lining
78,410
42.5%
ST-01 Station Box
44,120
23.9%
EW-01 Earthworks
27,870
15.1%
TR-01 Track and Systems
21,880
11.9%
UT-01 Utilities
12,340
6.7%
Material hotspots
Ranked by contribution to total GWP
Material contributions to global warming potential, ranked
MaterialPackageQuantityGWP factorTotal tCO2e% of totalData quality
Precast segmental lining, C50/60TU-0342,180 m31.488 tCO2e/m362,780
34.0%
Manufacturer EPD
Reinforcement bar, grade 500, all packagesAll39,400,000 kg0.762 kgCO2e/kg30,020
16.3%
Manufacturer EPD
Structural steel sections, S355ST-014,120,000 kg2.310 kgCO2e/kg9,520
5.2%
Industry average
In-situ concrete, C40/50 base slabST-0118,470 m30.394 tCO2e/m37,280
3.9%
Manufacturer EPD
Diesel plant, bulk excavationEW-01486,000 m30.0134 tCO2e/m36,510
3.5%
Generic
Shotcrete primary liningTU-0311,620 m30.446 tCO2e/m35,180
2.8%
Industry average
Grid electricity, tunnel ventilationTU-0314,900,000 kWh0.312 kgCO2e/kWh4,650
2.5%
Manufacturer EPD
Ductile iron pipe, DN600UT-014,210 m0.610 tCO2e/m2,570
1.4%
Generic
Rail, 60E1 profileTR-011,240,000 kg0.850 kgCO2e/kg1,054
0.6%
Manufacturer EPD
Bituminous surfacing, station approachST-018,940 t0.097 tCO2e/t870
0.5%
Industry average
All other materials (312 items)All- mixed54,186
29.3%
Mixed
Carbon by discipline
Structural
118,420
64.1% of total
Track
21,880
11.9% of total
Earthworks
17,300
9.4% of total
Geotechnical
14,680
8.0% of total
Utilities
12,340
6.7% of total
Assumptions applied
Transport, A4
82 km road average, 32 t articulated, 62% load factor
Construction wastage, A5
4.5% applied to all concrete and steel lines
Reference study period
60 years, shared with the LCCA so carbon and cost are comparable
Grid emission factor
0.312 kgCO2e per kWh in 2026, declining to 0.088 by 2075
Biogenic carbon
Reported separately, not netted
Characterisation
TRACI 2.1, GWP 100 year AR6
View calculation trace →
3,412 lines, 7 conversion rules, 94 open review flags