Quantities
Bill of quantities and model takeoff, reconciled to BOQ Rev14
HTP_NC_BOQ_Rev14.xlsx
3,412 rows | imported 14 Jul 2026 by Ravi Krishnan
TU03_Structural.ifc
1,180 elements | IFC 4x3, mapped to WBS
Manual entries
47 items | last edited 13 Jul 2026 by Dana Whitfield
Quantity lines with package, discipline and mapping status
Item IDDescriptionPackageDisciplineQuantityUnitSourceMapping status
TU-C-0114Precast segmental lining, C50/60TU-03Structural42,180m3BOQ Rev14Verified
PR-S-0088Reinforcement bar, grade 500, all packagesAllStructural39,400,000kgIFCVerified
TU-C-0210Shotcrete primary liningTU-03Geotechnical11,620m3BOQ Rev14Needs review
ST-C-0031In-situ concrete, C40/50, base slabST-01Structural18,470m3BOQ Rev14Verified
UT-P-0402Ductile iron pipe, DN600UT-01Utilities4,210mManualUnmapped
TR-S-0155Rail, 60E1 profileTR-01Track1,240,000kgBOQ Rev14Verified
EW-E-0007Bulk excavation, spoil to licensed fillEW-01Earthworks486,000m3BOQ Rev14Needs review
ST-S-0119Structural steel sections, S355ST-01Structural4,120,000kgIFCVerified
TU-W-0044Sprayed waterproof membrane, 3mmTU-03Structural68,400m2BOQ Rev14Verified
UT-C-0088Cable duct bank, 6 way PVCUT-01Utilities9,760mManualUnmapped
TR-B-0021Ballast, 31.5/63 crushed graniteTR-01Track74,300tBOQ Rev14Verified
ST-F-0067Architectural finishes, concourseST-01Architectural12,940m2IFCNeeds review
EW-G-0013Geotextile separator, class 3EW-01Earthworks142,600m2BOQ Rev14Verified
TU-G-0301Compensation grout, cement bentoniteTU-03Geotechnical6,880m3BOQ Rev14Verified
3,412 items3,278 mapped (96%)94 need review40 unmapped
Showing 14 of 14 loaded lines · sample of 3,412
NEXT STEP
Map materials
94 lines need review before calculation